FABRICATION
* Factory new machine: the factory is located at My Phuoc 3 IP, Binh Duong province, the areas with convenient traffic, the distance is around 1h traffic from the airport, seaport
* Sufficiently production layout
- Factory area: 12,000m2
- Capacity : 1,000 tons/month
* High-skill labor: the factory located at Binh Duong where the places have a lot of high-skill laborers in steel fabrication
* Production machinery is new, layout is arranged tidily.
* High quality & prestige material:
- Variety types
- Reputation sources
- Clear original certificate
- Comply to many standards: ASTM, JIS, EN, GB, TCVN
* Quality control for each stage of fabrication by clear procedures
- Managed by procedures
- Inspection in every single step
- Equipment, machinery is calibrated
MANUFACTURING & QUALITY CONTROL PROCEDURE
* The manufacturing process of pre-engineered steel structures at the factory is very important because the quality of each project is successful or not that decision by the process production.
* With a highly skilled & professionally trained worker and a factory system of 12,000 m2 are equipped with automatic production lines and high technology, tightly monitor by the ISO 9001:2015 quality management system. We are committed to bringing the best solutions, high-quality products, and the most perfect service to our customers & partners.